Completed Projects

Employbridge / Prologistix – Stockton, CA

This tenant improvement focused on building out of offices, training room, conference room, bathroom, reception area, bullpen area, a testing area, adding a new storefront entry, and ADA exterior improvements.  The scope of work included the construction of a new demising wall separating office area from warehouse with changes to exsisting mechanical, electrical, and plumbing. 



GNB – Elk Grove, CA

GNB in Elk Grove, CA was a tenant improvement that included the addition of existing adjacent warehouse space. There were slight modifications to existing office spaces that included building a small hallway to create a new office, opening an existing demising wall, and installing a new door for access into adjacent warehouse space.  We removed and relocated an existing 12’x12’ overhead door into an existing demising wall to allow fork lift access into the new warehouse. In the newly adjoined space, new high bay lights, space heaters and insulation at the roof deck were installed.  In the older section of the GNB space, we wall cut an existing 12x12 overhead door into a 22’x22’ opening which allows easy access for moving equipment in and out of the building.

MacBeath Hardwood – Stockton, CA

Pacific Construction was graciously allowed the opportunity to transform MacBeath Hardwood's new location in Stockton from a dark, outdated office to an open fresh showroom. Due to the building's electrical and HVAC systems being vandalized, the electrical panels and wiring were replaced along with an air conditioning unit. Multiple offices and the acoustical ceiling were demolished to open the space. The existing carpet was removed and replaced with a beautiful polished concrete. Newly installed spiral HVAC ducting provides a clean industrial look with the new insulated exposed roof deck. Low bay LED lighting was installed, along with new paint.



Shoreline Dr – Stockton, CA

This project was a tenant improvement of multiple offices due to fire damage.  Scope of work included, re-floating walls and texture to match remainder of office, paint, new ceilings, HVAC units, light fixtures, and new flooring throughout.

West Coast Magnetics - Stockton, Ca

A dark, unfinished warehouse was transformed into a bright, clean, open showroom and lab expansion.  Static dissipative flooring was installed as to not alter sensitive equipment or components being manufactured.  The existing offices were opened into the revitalized expansion offices through new acoustical ceilings, electrical, carpet, and paint.  Modern LED fixtures were installed throughout the expansion to save on daily operating expenses, lower energy usage, and provide maintenance-free lighting for years to come.  New roof top HVAC units were installed to condition the new space, and the exposed spiral ducting provides a simple, clean appearance.