Jiffy Lube - Tracy, Ca
Jiffy Lube Tracy is a 4,000 sf ground up facility that included a 1,114 sf pit located 9’ below grade. New wood framed building that included new office, restrooms, customer lounge, employee breakroom and four service bays. Finishes included paint, tile, acoustical ceiling, Retroplate finished shop floor, millwork, storefront, and eight overhead shop doors. The oil service pit is cast in place concrete with vapor barrier to ensure pit was water tight. We had to coordinate with Jiffy Lube equipment provider prior to setting of structural steel and pouring of concrete to ensure reinforcement, equipment anchors and slab penetrations were properly located at equipment locations. This project also include site and landscaping work. Site consisted of new grading, underground utilities, sand/oil separator, new paving, striping and two bio retention areas. Landscaping of new planter islands, entry and perimeter of site including two bio retention locations.